Welcome!

Share and discuss the best content and new marketing ideas, build your professional profile and become a better marketer together.

Sign up

You need to be registered to interact with the community.
This question has been flagged
4 Views

Repeatability on a monthly shoal survey is decided by four things — vertical datum, line keeping, draught offset and along-track sampling — and almost nothing by how many sensors are bolted to the vessel. If any one of those four drifts between runs, a second echosounder will only tell you the same wrong number twice.

The site. A tidal river channel with migrating shoals, surveyed monthly at spring tides. Working depth 2–12 m over the shoal crests, 0.8 km of line length per section, twelve sections across the channel. Platform is a Uscan‑USV‑6S with the 200 kHz single-beam echosounder and RTK GNSS; autopilot firmware version is unspecified on our unit. The question is what the minimum kit is that still produces lines I can difference month to month without arguing about the method.

What we already tried. RTK is held in fixed solution except within about 150 m of the bridges, where it drops to float for tens of seconds. Draught offset is checked with a bar check before and after each sortie. Boat speed is held at 1.5 m/s over ground rather than through water. We log the RTK height as well as the reduced depth, so both a tide-gauge and an ellipsoid reduction are possible after the fact. What we have not settled is the acceptance rule: how large a between-run difference counts as a real shoal change rather than method noise, and which of the four contributors is worth spending money on first.

The arithmetic that sets the kit. Endurance is quoted as up to 7 h at 1.5 m/s on the Uscan‑USV‑6S and USV‑8 platforms, so the track budget is about 37.8 km per sortie before turns and station keeping; twelve 0.8 km lines is 9.6 km, which leaves plenty of margin for repeat passes. Along-track spacing follows the ping rate: 10 Hz at 1.5 m/s gives 0.15 m between soundings, 5 Hz gives 0.3 m. Beam footprint at 10 m depth cannot be computed from the published page because the beam angle is unspecified — needs field verification with a target of known size before anyone claims a detection limit.

Minimum kit as we see it. (1) RTK fixed solution with a local base or NTRIP, and an explicit rule that float epochs are flagged and not interpolated; (2) 200 kHz single beam with the draught offset measured to ±2 cm by bar check, re-checked whenever payload or battery position changes; (3) sound speed from a surface sample or a modelled profile, recorded per sortie rather than assumed; (4) one vertical datum policy applied consistently — tide gauge reduction or RTK ellipsoid heights, not a mix; (5) line spacing of 5–10 m for a single beam at these depths, because a single beam has no swath and spacing is the only coverage control; (6) speed over ground logged from RTK, since through-water speed will not hold line spacing against current.

Questions. At 2–12 m depth on a tidal channel, is 6 m line spacing with a single 200 kHz beam defensible for monthly shoal differencing, or does a narrow scour hole between lines force side-scan coverage as well? Which draft of the four contributors — draught offset, sound speed, tide reduction, line keeping — usually dominates a 0.2 m between-run difference in your experience, and what acceptance threshold do you apply before calling the change real? And is 0.15 m along-track spacing worth the data volume at 1.5 m/s, or do you decimate to 0.3 m and interpolate?

Avatar
Discard